Done!

On December 26th 2009 I began a new project to finish off a bedroom and bathroom in our basement. Terri and I were suffering in that our 3 bdroo, 2 bathroom home did not see large enough. So I set out to finish off the last unfinished area in our basement. I did not know how long it would take, nor did I have a deadline. You can see the progress after the first week of labor in this blog. Progress slowed dramatically with the health situation of Terri's mother, and later when a cabinet shop delvered the bathro vanity 5 weeks late. On Sunday I finished the project and wanted to share the pictures.

To the right you will see a view of the entrance into the newly finished area. In the background, you see the door to our safe room which is now sheetrocked.




After stepping through the new entrance and turning to the left, the new bathroom is to the right and the new bedroom is straight ahead. To the left is access to the furnace room.











Looking into the bath room, vanity and toilet are on the right side.








The delayed vanity was built by the cabinet shop that provided all of our kichen cabinets.

















A walk in shower is on the right.

















And finally the new bedroom. Yes, that is a flatscreen TV on the wall.



















.